Snow Biking in Japan

cycling training on snow with road racing bikes with studded tires

Mt.Tokachidake (Mt.Tokachi) 201

Temperature: minus 5 degrees Celsius at the Tokachidake Hot Springs (Tokachidake Onsen).

There was no snow removal operation for three days. Therefore, the traces of the training Mt.Tokachidake 200 which had been effectuated three days before were still there. The road was covered with mostly hard ice. He repeated the interval training at the summit.

Pictures